- To create an enabling policy framework for the deployment of 20,000 MW of solar power by 2022
- The Mission will adopt a 3-phase approach; Implementation of Phase 1 would end in 2013; Phase 2 in 2017 and Phase 3 in 2022. The target for Phase 1 is 1,000 MW, an additional 3,000 MW through capacity enhancements are expected to be driven by the solar-specific RPOs and the use of Feed in Tariffs in Phase 2. Based on the ‘learning’ of the first two phases, the expectation is that solar power will be close to achieving grid parity and this will allow build up of the remaining capacity required to meet the 20,000 MW target by 2022.
- To make India a global leader across the value chain in solar manufacturing with a targeted 4-5 GW equivalent of manufacturing capacity by 2020. This includes dedicated poly silicon manufacturing capable of producing 2 GW equivalent manufacturing capability on an annual basis